| CODE | SUBJECT | DATE | BRIDGE MANUAL REFERENCE |
| 94-001 | INTRODUCTION TO STRUCTURES DESIGN ADVISORIES | 11/21/94 | |
| *94-002 | PIER REINFORCEMENT PLACEMENT | 11/21/94 | Section 11.6.1.2 & Section 11.6.1.3 & Section 15.10 |
| *96-001 | UTILITIES ON BRIDGES WITH INTEGRAL ABUTMENTS | 10/10/96 | Section 11.5.1.6 |
| *96-002 | GUIDELINES FOR DRILLING AND GROUTING ANCHOR BOLTS AND REINFORCING BARS, AND EMBEDMENT DEPTHS | 11/26/96 | Section 15.14 |
| *97-001 | RETROFITTING SIMPLE SPAN STEEL BRIDGES AS CONTINUOUS | 01/08/97 | Section 19.5 |
| *97-002 | REMOVING STEEL SUPERSTRUCTURES OR SUBSTRUCTURES CONTAINING LEAD-BASED PAINT | 05/15/97 | Section 17.2 |
| *97-003 | STAGE CONSTRUCTION OF BRIDGE DECKS - DESIGN GUIDELINES | 08/18/97 | Section 5.1.9 |
| *01-001 | GALVANIZED REINFORCING BARS | 07/23/01 | Section 15.12.2 |
| *02-001 | PAINTING BRIDGE RAILING | 08/16/02 | Section 6.3.3.2 |
| 02-002 | GUIDANCE FOR FRP REPAIR AND STRENGTHENING OF CONCRETE SUBSTRUCTURES | 09/06/02 | |
| 02-003 | FRP DECKS & SUPERSTRUCTURES | 12/09/02 | |
| *03-001 | CONTRACT PLANS WITHOUT REINFORCING BAR LISTS | 03/11/03 | Section 15.13 |
| *03-002 | ERECTION GUILDELINES & SPLICES FOR STEEL GIRDERS | 07/24/03 | Section 8.11 |
| *04-001 | DETAILING GUIDELINES FOR CIP PILES | 02/26/04 | B D Sheet BD-MS5 R2 |
| 08-001 | GUSSET PLATES DESIGN PROCESS | 04/14/08 | |
| 08-001 | LRFD GUSSET PLATE DESIGN AND ANALYSIS MATHCAD WORKSHEET, 3.6Mb | 04/14/08 | |
| * Indicates that the Design Advisory has been incorporated into the NYSDOT Bridge Manual and/or Bridge Detail Sheets. |